Requirements to Prepare Before Starting Renovation or Interior Work
Renovation or Interior projects often come to trouble when Design, Budget, System Work and Area Limitations are separated. The Requirement Preparation from the beginning makes the design team, engineers, subjects and users talk the same language easier.
1. Identify the purpose of the area.
Who uses this area, how many people, what activities and what problems you want to solve. These information should be before selecting Style.
2. Configurate Concept and Brand Direction
Image, material, color, sensation and customer experience should be defined as a common direction to ensure space planning and interior design consistent.
3. Explore the work page limitations
The original structure, the work of the electricity system, air supply, emergency, entry-out and working time limitations have an impact on both design, cost and timeline.
4. Separate Must-have with Nice-to-have
The Requirement Separation allows budget regulations without affecting the main function and makes the team offer Material Alternative or Value Engineering right in point.
5. Set Timeline Combined Approval and Handover
In addition to construction time, allow for design approval, material approval, production, installation, inspection and a punch list before the space goes into use.