Project Handover Checklist: What to Inspect Before Accepting Renovation / Interior Work
The assignment should not only be a check of whether the work is “finished or done,” but should be checked whether the space is actually available. The complete documentation and the scarcity issues are clearly managed.
MEP Coordination Before Renovation: When to Align Electrical, Plumbing, HVAC and Fire Systems
The renovation project that seems to be a matter of the Interior is often related to multiple building assembly systems. If you start design without welding, electricity, air and fire system, the risk of solving and scratching workplaces will be higher.
Preventive vs Corrective Maintenance: Which Approach Should Your Organization Plan?
The good facility maintenance is not waiting to lose and gradually repair, but it is to separate which tasks should be prevented in advance and which tasks are fixed when the real scene.
Medical Consumables Sourcing: Reducing Shortages and Specification Mismatches
Many medical materials and materials are continuously required. The supply should not only be considered by price, but should be considered by the conformity of specialties, the availability of the supplier and the continuity of delivery together.
MRI / CT / X-Ray / Mammogram: Space and Systems to Prepare Before Procurement
The selection of radiation tools should not be seen only the Specification of the machine. Because the success of the project depends on the scale, the support system and coordination of the relevant agencies to make the machine in real use.
GMP / FDA / HACCP / HALAL / ISO: Prepare Systems and Evidence Before the Audit Rush
The common risk in the preparation of Audit is accelerating the documentary delivery at the end. More importantly, the system, the documentary and the operation must be truly consistent.
Monthly Consulting: What Executives Should Receive From On-site Consultation & Reporting
Monthly consultation should help the manager “see the picture and make decisions” more than summarizing what the activity they have done last month.
JCI / HA / DNV / ACI Readiness: Gap Assessment, Mock Survey and Action Plan Compared
The standard preparation of the nursing station should not start with “closing” alone, but should begin with knowing the actual state of the system first. Then arrange what to be developed in accordance with the time and resources of the organization.
How to Write a Project Brief for a Hotel & Wellness Project
The Hotel & Wellness project, starting with the word “I want to look relaxed and premium,” is not enough for the Project team because these words need to be converted into Target Segment, Service, Space and Experience that can be captured.
After Renovation: Planning Ongoing Facility Support
Many projects are handover day, but in the corner of Operations, that day is the date when the space is actually started to be used. The system, equipment and materials are beginning to enter the maintenance track.